Clarkston Road High Friction Surface Treatment

Location: Clarkston, MI


Summary

Oakland County Road Commission chose Smith’s Waterproofing to install a high friction surface treatment on Clarkston Road. Work was performed on three specific corners, where multiple vehicular fatalities have occurred. Smith’s Waterproofing was the prime contractor for the job and was allowed three weekends to complete the project. The project was completed in just one weekend through great planning and execution by the foremen and crews.

One of the challenges faced during this project was communicating with the homeowners that lived on the road, and keeping them informed of the construction schedule. Each lane of the road was shut down for 6 hours while the epoxy cured. During this time, homeowners were not able to enter or exit their driveway with their vehicles. To ensure the homeowners were not restricted from leaving their homes, Smith’s communicated with over 40 individuals with homes on Clarkston Road to ensure they were aware of when the road would be closed. This allowed for homeowners to park their vehicle in nearby locations and have the ability to travel freely.

Over 53,150 square feet of high friction surface treatment was installed on Clarkston Road by Smith’s Waterproofing. Five shotblast machines were utilized for the surface prep to create a Concrete Surface Profile (CSP) 3 on the road surface, while two crews installed the high friction surface treatment. Smith’s also provided traffic control and cleanup services for the project.

This project was completed two weekends ahead of schedule and under budget. This was another safe project completed with no near misses, accidents or injuries.

Highlights

  • Over 53,150 square feet of High Friction surface treatment installed in a 3-day weekend
  • Completed one week ahead of the completion date
  • Project complete under budget
  • Completed ahead of schedule
  • Zero accidents and injuries

I-75 High Friction Surface Treatment

Through the Michigan Department of Transportation, Smith’s Waterproofing acted as the prime contractor on the I-75 High Friction Surface Treatment (HSFT) on I-75 north bound between 11 Mile Road & 12 Mile Road. The project included surface prep of the highway…

Kalamazoo High Friction Surface Treatment

The State of Michigan and MDOT awarded Smith’s Waterproofing the project to install high friction surface treatment on multiple accident-prone locations on the I-94/US-131 interchange, as well as, Gun Lake Casino ramp, Business Loop 94 or US-131…

M-20 Emergency Repair

Smith’s Waterproofing utilized 3 crews to perform emergency repairs on M-20 over the Tittabawassee River. This project had an expedited schedule due to the condition of the bridge, which was deteriorating rapidly. Large amounts of concrete were missing, leaving re-bar exposed…

Mansiding Emergency Beam Repair

The Mansiding Road overpass located over US-127 was severely damaged by a high-load hit. The concrete beam that supports Mansiding Road sustained most of the damage and required an emergency repair…

Zilwaulkee Bridge

In 2013, the mile and a half long Zilwaukee Bridge was shut down for sealer overlay (healer sealer), structural crack repair to bearing pads, and bearing pad replacement. Smith’s Waterproofing installed sealer overlay (healer sealer) over the entire…